±500kV穆家换流站设计原则及自主化设计特点 被引量:7

Principles and Characteristics of Independent Design of ±500kV Mujia Converter Station
下载PDF
导出
摘要 ±500 kV呼伦贝尔—辽宁直流输电工程是我国首个采用直流输电技术的煤电基地电力外送工程,同时也是我国首个完全自主研究、设计、制造、建设及调试的±500 kV直流工程。该工程由两端换流站、908 km线路及配套通信工程组成,工程设备国产化率达到100%。介绍了呼伦贝尔—辽宁直流输电工程受端±500 kV穆家换流站的主要设计原则,总结了±500 kV穆家换流站的主要设计特点,并对主要创新点进行了详细分析。通过对穆家换流站的总结,期望对高压直流换流站乃至特高压直流换流站的设计有一定的帮助和借鉴作用。 Comprised of two converter stations,908 km HVDC OHTL and supporting communication facilities,±500kV Hulunbeier-Liaoning HVDC transmission project is the first coal-electricity base HVDC transmission project.It is also the first project whose entire research,design,manufacture,construction and commission are performed independently in China.The components used in project are 100 percent made in China.The design principles of ±500 kV Mujia converter station,the receiving terminal of Hulunbeier-Liaoning HVDC transmission project,are introduced.The design characteristics in Mujia converter station are summarized,and some innovating points are analyzed in detail.The summary provides helpful suggestions and reference for future HVDC and UHVDC projects.
出处 《中国电力》 CSCD 北大核心 2012年第7期13-15,共3页 Electric Power
关键词 高压直流换流站 设计特点 自主化 HVDC converter station design characteristics autonomy-based
  • 相关文献

参考文献10

二级参考文献20

共引文献40

同被引文献71

引证文献7

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部