寺河矿东井区接替盘区瓦斯抽采设计 被引量:4

Design on Gas Drainage of Supersedure Panel in Sihe Mine East Shaft
下载PDF
导出
摘要 寺河矿东井区初步评估为煤与瓦斯突出矿井,文章依据煤与瓦斯突出矿井瓦斯抽采要求,从地面井瓦斯抽采、回采工作面瓦斯抽采、掘进工作面瓦斯抽采等方面设计了瓦斯抽采方法,并从瓦斯抽采率、抽采时间和抽采负压三个方面分析了瓦斯抽采参数,验证了寺河矿东井区接替盘区瓦斯抽采设计是完全有效的,通过瓦斯抽采确保矿井安全高效的生产。 The preliminary assessment result of Sihe coal mine east shaft area was coal and gas outburst mine, according to the gas drainage requirement of coal and gas outburst mine, the gas drainage methods were designed, comprising ground gas drainage, mining face gas drainage and driving face gas drainage, the gas drainage parameters were analyzed, such as drainage rate, drainage time and suction pressure, the drainage effect was verified, the design was effective, ensuring the safe and high- efficiency production.
作者 王建会 冷峰
出处 《煤炭工程》 北大核心 2014年第8期22-24,共3页 Coal Engineering
关键词 寺河矿 煤与瓦斯突出 瓦斯抽采 盘区接替 Sihe coal mine coal and gas outburst gas drainage panel supersedure
  • 相关文献

参考文献7

二级参考文献10

共引文献72

同被引文献24

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部