摘要
综合布线工程是学校网络建设的重要组成部分,是校园信息化的基础工程。如何才能完成一个优秀的校园综合布线工程呢?首先要做好布线的设计工作,其次要合理选材,最后是工程的实施。工程的实施环节包括工程的准备、实施、验收、使用等。
Integrated cabling project is the important composing part of college's network construction, as well as the basicproject of campus information. How to complete an excellent campus integrated cabling project? Firstly it needs to do the designing work of cabling well. Secondly it should choose materials reasonably. Finally it is the implementation of project. The project implementing steps include the preparation, implementation, check and usage.
出处
《辽宁高职学报》
2012年第12期72-74,共3页
Journal of Liaoning Higher Vocational
关键词
综合布线
设计原则
工程实施
综合布线流程
integrated cabling
designing principle
project implementation
integrated cabling flow