摘要
结合七星河水库枢纽工程地形地质条件,对工程坝址、坝线、枢纽布置方案进行比选,择优选取浆砌石重力坝枢纽布置方案并实施,结果缩短了工期、降低了造价、增加了工程效益。
Combined with the topographical and geological conditions of Qixinghe Reservoir Complex, alternatives were compared in respects of dam site, dam axis and general layout, based on which the cemented stone gravity dam alternative was selected and implemented, rendering shorter construction period, less construction cost and more benefits.
出处
《广西水利水电》
2009年第4期16-18,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水利枢纽
布置
方案
比较
Hydraulic complex
layout
alternative
compare