摘要
以"向家坝~上海±800kV特高压直流线路工程"岩石锚杆基础施工图设计资料为研究对象,在合理测算岩石锚杆基础定额基础上,对其工程造价进行计算,并与对应的常规岩石基础进行对比分析,总结岩石锚杆基础的造价特点及应用前景。
Taking the construction drawing design materials for base of rock bolt of "Xiangjiaba~Shanghai ±800kV Ultra-high voltage direct current line project" as research object,based on rational quota estimation of base of rock bolt,its construction cost was calculated and compared with that of conventional rock base.The cost characteristics and application prospect of the base of rock bolt were summarized.
出处
《电力技术》
2010年第3期7-9,共3页
Electric Power Standarization & Construction Cost Control Information